77469 Timi.adeojo@gmail.com 832-434-8923 Planner/Scheduler
with working experience from a small/medium to large scale projects with the
capability of leading discussions regarding building and updating a plan as
well as critiquing the progress against what was planned and suggesting ways
to improve on progress. Worked on projects that included Plant Construction,
Pipeline and Power Generation within the oil and gas industry. With over 12
years extensive knowledge using Primavera (P3, P5, P6) and MS Project, MS
Office applications, SAP, performed planning/scheduling, Cost Planning,
Resource loading, Tracking, Monitoring, Estimate at Completion, Budgeting,
Earned Value, Forecasting and Critical Path Analysis. HIGHLIGHTS ·
Extensive
knowledge of Turnaround scheduling processes, maintenance/turnaround planning
and estimating ·
Extensive
experience using Project Management Software for Project management and
Turnarounds ·
Experience
in reading and interpreting blueprints and drawings ·
Developed
work scope and estimated number of hours invested ·
Operational
knowledge of conducting routine maintenance for mechanical equipment and
pipes ·
Perform Job
walk / site verification to ensure Job packages are fully complete and
satisfactory ·
Comprehensive
knowledge of how to plan and sequence complex jobs using safety as first
priority ·
Extensive
experience working on FPSO projects for MODEC and Chevron ·
Experience
in Earned Value Management System (EVMS) ·
Analyze,
compare and forecast current status against established baseline schedule ·
Develop,
monitor, track, and report on project schedules having resource loaded
activities using WBS coding ·
Convert
project schedule from Primavera to MS Excel for discipline use and
adjustments ·
Strong
working knowledge of critical path method – CPM ·
Tracking
P&IDs, electrical deliverables, process flow diagrams, and procurement
spreadsheets ·
Tracking and
monitoring the progress of the various modules of the rig which comprised of
engine, mud pump, sack storage, generator, cement tank modules etc ·
Progress
reporting of plan/schedule to different work stream focal points ·
Schedule
forecasting and risk management ·
Generate and
print a variety of reports or requirements for submission to the, assigned
shops or various requestors or leads ·
Experience
working with SAP procurement, bid evaluation with purchase orders ·
Experience
with construction and mechanical completion projects ·
Experience
with floating, production, storage and offloading vessel [FPSO] technology in
project control capacity ·
Perform
schedule revisions and update based on client cut-off ·
Represent
and participate with meeting vendors and contractors ·
Creating
production of reports in both graphic and tabular form EDUCATIONAL
BACKGROUND Certifications ·
Primavera
(P3, P6) and MS Project ·
CB&I –
June 2009 o
Project
System, PS51 ·
CB&I –
January 2009 o
Creating
Materials and BOMs; SAP Basic Navigation ·
SAP Basic
Project System (Project Builder), Michael Management Corporation, January
2010 ·
Microsoft
Learning – August 2012 o
Advanced
Training for Microsoft Office Excel 2003, Core Training for Microsoft Office
Project 2003 ·
Microsoft
Learning – December 2012 o
Forecasting
and Trend Analysis Using Microsoft Office Excel 2003; Setting Up Projects for
Success Using Microsoft Office Project 2003 University of Ilorin ·
BSc Computer
Science PROFESSIONAL
EXPERIENCE ConocoPhillips USA, HOUSTON, TX
January 2014 – Present Eagle Ford Drilling Project Planner/Scheduler ·
Created,
maintained, tracked progress of Eagle Ford Facilities Planning and Scheduling ·
Details plan
for each job including the crane requirement for lifting activities ·
Created
contingency plan for critical equipment ·
Monitored
and controlled annual Shutdowns with respect to the approved
plan/schedules/milestones and prepare daily reports using S-Curves and
presented to the upper management ·
Monitored
and ensured quality forms are being utilized and recorded such as work
control sheet, variation order and box up certificate ·
Developed,
study, review and fully understand job packages content and work scopes
within the area ·
Prepared all
necessary work permits, monitoring and control of work activities required
for daily expediting and liaison pertaining to the WORKS ·
Reviewed
with responsible department and update in Turnaround Master Schedule job
packages for all Turnarounds jobs ·
Updated
drilling and Completions Schedule with Macro ·
Provided
weekly progress updates to upper management ·
Provided
planned schedule to model the gas system with Karnes CDP going down with all
production going to Cuero West ·
Updated
Blowcase, Rig name and Central Facility name with vlookup ·
Created
logic Flow diagrams for Pre and Post Spud wells ·
Performed
plan/schedule revisions and update based on client cut-off ·
Drives
alignment and logic into planning by recognizing errors ·
Produced reports
on productivity, manpower and resource utilization and recognizes what format
reporting style best illustrates the problem the team has identified ·
Recognized
when physical circumstances or lack of resources will produce sub optimal
results and drives resolution within team ·
Worked with
other team planners/schedulers as well as contractors and vendor
planner/schedulers to build and maintain a fully integrated plan/schedule WorleyParsons USA, HOUSTON, TX
May 2012 – January 2014 British Petroleum MAD DOG Projects;
Chevron FPSO Project; MODEC FPSO Project Principal Planner ·
Created,
maintained, tracked progress of the plan/schedule break down which included ,
pre-feed, feed, detailed engineering, procurement, mechanical completion,
construction, disassemble & load out then load out and sail away ·
Developed
Manpower planning, Optimization and control for Shutdowns ·
Prepare Bar
Char development, scheduling and monitoring ·
Prepared Job
Cards of all shutdown jobs which include Detail Activity Breakup, Manpower
requirement for each activity and logistics requirements ·
Responsible
for preparation and updating the commodity release plan ·
Participated
in Turnaround Readiness Assessment Process (TARAP) ·
Participated
in Post Turnaround critique review and reports preparation ·
Integrated
Resource loaded hourly Turnaround Master Schedule as per the job list and
scope ·
Monitored
Actuals during execution Turnaround & Shutdown monitoring and reporting
during the entire execution phase ·
Walked down
jobs and planned steps per job task using Excel ·
Prepared
monthly project progress summary reports that included the updated schedules
utilizing P6 and prepared/analyzed schedule reports and schedule variance for
the Project ·
Provided
earned value reporting and change management Measured progress plan with the
Earned Value Technique. ·
Performed
bi-weekly schedule updates and created reports for upper management and
discipline leads involved ·
Developed
WBS and coding structure to ensure proper plan/cost/schedule monitoring. ·
Prepared
manpower histograms, and look-ahead schedule Worked as a senior
planner/scheduler for the EPC of new build drilling rigs ·
Identify
critical issues and propose corrective actions ·
Developed
various levels 1 bid proposal schedule for EP, EPC and EPCM projects · Supported the development of project work breakdown
structures, creating resource loaded schedules, maintaining schedule status,
and creating progress and reports. Technip USA, HOUSTON, TX
October 2009 – April 2012 SUBSEA Planner ·
Prepared
reports on productivity, manpower and resource utilization and recognizes
what format and reporting style best illustrates the identified problem ·
Contacted
vendors as needed ·
Tracked
progress of the schedule break down which included , pre-feed, feed, detailed
engineering, procurement, mechanical completion, construction, disassemble
and load out then load out and sail away ·
Performed
bi-weekly schedule updates and created reports for upper management and
discipline leads involved. ·
Tracked/monitored/progress/forecast
and run estimate at completion analysis for multiple projects ·
Exported
schedule from MS Project to Excel for other discipline and management use. ·
Prepared
monthly project progress summary reports that included the updated schedules
utilizing MS Project ·
Prepared
monthly project progress summary reports that included the updated schedules
utilizing P6 and prepared/analyzed planning/schedule reports and schedule
variance for the work scope ·
Provided
earned value reporting and change management Measured progress plan with the
Earned Value Technique ·
Established
critical paths within a project using float path analysis and monitored
actual progress and compare to baseline and make changes to schedules as
required in work scope · Supported the development of project work breakdown
structures, creating resource loaded schedules, maintaining schedule status,
and creating progress and reports CB&I Subsea, HOUSTON, TX November 2008
– September 2009 Chevron, Jack and St. Malo Subsea Pump
Systems (SSPS) FEED Study, Gulf of Mexico PLANNER/SCHEDULER ·
Designed workload
balancing strategies in P6 ·
Created
project milestones schedule and the master model for client review ·
Periodical
meetings with the site engineer and general foreman to organize the
activities performing and labors allocations and giving his instruction for
specific activities ·
Analyzed
schedule progress and accurately forecast new timelines when necessary ·
Collaborate
with Project Managers to document and report physical percent complete ·
Estimated
time involved in tasks to completion ·
Liaise with
contractors to receive and distribute schedule updates ·
Tracked
engineering documents/drawings progress workflow from Start/IDC/Issue for
Client Reviewed/IFC and also created and tracked activity networks/charge
codes for all subsea product ·
Developed
and maintained a resource loaded project schedule/baseline to include
Engineering, Procurement and fabrication/Construction ·
Produced
monthly reports to show project progress, tracked MDL to update schedule.
Maintained and tracked fabrication/manufacturing activities to meet
installation ·
Tracked all
engineering deliverables through workflows before it is issued for
construction. ·
Created
reports used for manpower projections and productivity. Developed WBS and
coding structure to ensure proper cost/schedule monitoring. Prepared progress
curves, man-hour forecast, manpower histograms, and look-ahead schedule ·
Developed
detailed plans/schedules as related to mechanical modifications and tracked
project actual and metrics and delivered metrics so that Managers could make
project and resource decisions. Generate reports from project data and
analyze productivity reports to ensure budget adherence. Shell, HOUSTON, TX April 2008
– October 2008 SENIOR PLANNER/SCHEDULER ·
Attended
project specific meeting with clients and contractors on project progress and
maintenance of plan/schedule ·
Created
multiple resource loaded plan/schedules, maintaining plan/schedule status,
and creating progress and reports to upper management ·
Prepared and
analyzed schedule reports and schedule variance for the work scope and also
provided earned value reporting and change management Measured progress plan
with the Earned Value Technique ·
Established
critical paths within a work scope using float path analysis and monitored
actual progress and compare to baseline and make changes to plan/schedules as
required in work scope ·
Developed,
managed, updated, and monitored individual plans/schedules and integrated
overall master program schedule from proposal through work ·
Made
recommendations for planning/scheduling and also developed “what if"
scenarios and perform analysis to determine the most effective method of
planning/scheduling ·
Worked
directly with the individual project managers and lead engineers / designers
to develop work plans and schedules and to ensure that all project
requirements were in place and tracked, during the planning stage and during
project execution. ·
Supported
project manager while assisting project coordinators with monthly client
requirements. ·
Gave
progress report of schedule to different work stream focal points. ·
Identified
critical issues and propose corrective actions. ·
Went onsite
to the field to get firsthand look and progress to monitor project progress
in real time. MODEC, HOUSTON, TX
March 2004 – February 2008 SENIOR PLANNER ·
Prepared
progress reports and ensuring that the project is on time and on budget ·
Identified
manpower, materials, and equipment needed to safely perform tasks to complete
turnaround ·
Planned and
coordinated six week turnaround within the $3MM without incurring injuries or
environmental spills ·
Led daily
schedule progression meetings where issues and the next days work and safe
permits were discussed ·
Tracked cost
and generated estimates to keep the Turnaround manager informed of the budget
and expenditures ·
Created the
closure report and reviewing it with operations and maintenance leadership ·
Managed the
meetings with the key personnel of the project to discuss all of technical
problems and prepare and execution plan for every discipline to follow ·
Attend
progress meetings with project management, subcontractors to review and
approve baseline schedules, and attended other scheduled meetings as
necessary to stay current on schedules ·
Tracked and
input of production quantities and also updated constructing schedule and
tracked critical path ·
Integrated
construction schedule into master project and continuously monitor progress ·
Performed
schedule development, resource loading and S-Curve reports ·
Updated the
project schedule as required to keep it current. ·
Coordinated
with shop leads to ensure successful completion of work and accuracy of
information received ·
Used
critical path methods (CPM) to prepare the schedule and monitor performance ·
Prepared
monthly project progress summary reports that included the updated schedule ·
Input data
from work documents/packages for assigned shops which included man hours and
associated trade codes, and notes pertaining to specified work. ·
Kept track
of all assigned work documents and provides up-to-date status to assigned
shops and management ·
Performed
critical path analysis to identify potential problems in a schedule and
recommend corrective actions AGIP Oil, NIGERIA
January 2003 – December 2003 PLANNER ·
Led a team
directed by Project Control Manager to organize and prepare Project Closeout
Report and the Cost ·
Analyze
project performance utilizing Earned Value Management System (EVMS) ·
Developed
procedures/instruction for preparation and maintenance of project plans.
Master/detail schedules and activity coding structures such as CBS, OBS, and
WBS ·
Worked with
construction subcontractor and home office in developing the project master
schedule for the EPCM project ·
Worked in
the project controls department on the master schedule for the FPSO subsea
project. ·
Work with
the subcontractor in the development of the weighted detailed construction
schedule ·
Identified
and processed scope changes and submitted to the client. ·
Verified
subcontractor’s progress ·
Prepared
periodic schedule reports on the status of Engineering, Procurement and
Construction activities ·
Prepared/submitted
progress reports and issue to management and discipline leads ·
Conducted
critical path and what-if analysis of projects to propose
corrective/preventive actions ·
Performed
cost analysis and forecast field cost ·
Prepared
monthly project progress summary reports that included the updated schedules
and also performed resource and loading leveling ·
Critically
reviewed final project status, communication procedures, status of
deliverables, and projects activities to ensure all commitment were met per
project goals/objectives ·
Participated
in preparation, organization, and execution of a planned 45 day shutdown
which consisted of Pre-Shutdown, Shutdown, and Post Shutdown and Start Up
phases of the Project |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|